Skip to main content
Solar Park Background

Increase Solar Yield Through Natural Ecosystem Regeneration

The first service combining solar efficiency with ecosystem regeneration—backed by science, proven by data.

2-4%
Higher Energy Yield
18-25%
ROI per 100MW park
5-7yr
Payback Period

The Problem

In tight margins, every percentage point matters

Traditional solar parks leave money on the table

Aerial view showing water management challenges at solar parks - standing water and poor drainage affecting panel performance

Water Retention Loss

  • Bare, compacted soil
  • Zero water infiltration
  • Immediate runoff

Click for details

Production Loss

  • Panels reach 70+°C on hot days
  • 3-5% efficiency loss from heat
  • Accelerated degradation

Click for details

Higher O&M Costs

  • €40-80k/year per 100MW
  • Dust accumulation from bare soil
  • Frequent maintenance cycles

Click for details

Compliance Challenges

  • Community opposition
  • Environmental regulations
  • Biodiversity requirements

Click for details

The Solution

The Soil Sponge Effect

Transform solar parks into productive ecosystems

Healthy Soil + Native Vegetation + Water = Natural Cooling

Before: Degraded Land

  • -Bare, compacted soil with zero water retention
  • -High surface temperatures (70-75°C)
  • -Dust accumulation on panels
  • -Low soil carbon and low biodiversity
Soil Sponge Effect

After: Soil Sponge Effect

  • +Living soil with 400% water retention capacity
  • +Natural cooling reduces temps by up to 10°C
  • +Vegetation reduces dust by 60%
  • +3-5% efficiency gain recovered

Measurable Impact

Water Retention
+0%

Soil moisture capacity

Production
3-5%

Energy yield increase

O&M Costs
40-60%

Lower maintenance

Longevity
1-5

Years extended life

Biodiversity
+0%

Species increase

Add €185-435K Annual Revenue to Every 100MW Park

Side-by-side comparison: Traditional maintenance vs. Living Soil approach

Financial comparison chart showing ROI improvement with TerraNext living soil approach versus traditional maintenance - demonstrating 185-435K annual revenue increase per 100MW park

Based on 25-year lifecycle analysis across 50+ European solar installations

Scalable Solution

From One Park to Enterprise Scale

Expert-supported service delivers comprehensive assessment results in weeks, not months

Upload park characteristics via CSV or manual entry for portfolio analysis. Our platform supports bulk uploads for enterprise portfolios.

Features

  • CSV bulk upload for multiple parks
  • Manual entry with guided forms
  • GIS integration with satellite imagery

Deliverables

  • Park profile with geospatial data
  • Initial site suitability score
Monte Carlo simulation showing probability distributions for solar park performance predictions - demonstrating bankable confidence levels for financial projections

Bankable Projections, Not Guesswork

Our Monte Carlo simulations run 10,000+ scenarios to give you confidence intervals that satisfy even the most demanding lenders. Every projection comes with P50, P75, and P90 values that meet financing requirements.

  • P90 confidence levels for debt financing
  • 10,000+ Monte Carlo scenarios per analysis
  • Lender-ready reports and documentation

Ready to Recover the 3-5% You're Leaving on the Table?

Join leading solar companies optimizing for long-term productivity

Start with a free assessment—no commitment required

✓No upfront commitment
✓GO/NO-GO at every phase
✓Return on Investment guaranteed